Our Projects
Watershed Feasibility Study and Landscape Management Plan Development
Development of Addressal Mechanism for problems and risks associated with construction and operation of hydro-electric power plants in Nepal
Updating and developing National Water Supply Design Guidelines
Understanding human-tiger conflict risk in the Eastern Terai Arc Landscape
Conducting Pre-Feasibility Study & Analysis Report of various rural Community Water Supply System in Makwanpur & Chitwan District
Technical Engineering Services to Carrying Out Preliminary Surveys, Designs Review, and Construction Monitoring of WSS Schemes
SCOPING STUDY FOR ALTERNATIVE WATER SUPPLY SERVICE OPERATING AND MANAGEMENT MODEL
Consulting Services for Feasibility Study of Pinguwa Gurdum Kande Irrigation Sub Project, Laligurash Municipality-9 Tehrathum.
Detailed Feasibility Study of Irrigation Projects
1. Chemwang Deurali Irrigation Project, Malika Rural Municipality 2. Mahakhola Irrigation Project , Mangala Rural Municipality 3. Jhakripani Irrigation Project, Mangala Rural Municipality
Detailed Feasibility Study report of i. Bagada Kaba Irrigation Water lift Project (10 ha) and BaisisenMayajuila Water Lift Project (31) Ha.
Detailed Feasibility Study of Gadhaghat Irrigation Project, Chairal Khola, Kapilvasthu.(256HA)
Detailed Feasibility Study of LamtiyaBadh Irrigation Project, Kapilvasthu.(192HA)
Detail Feasibility Study and Report Preparation of Dichchhe Kholti khet Irrigation Project (32 HA)
Conduct Detailed Assessment of Educational and Physical Infrastructure of the Proposed Model School, and Prepare School Specific Multi Year Coasted Master Plan of Various Model Schools.
Preparation of Master Plan and Detailed Project Report of Dhunibeshi Hospital Building, Dhunibeshi Municipality
Preparation of Master Plan and Detailed Project Report of Rural Municipality Building of Aandhikhola Rural Municipality, Syangja
Preparation of Detailed Project Report of Road and Drain of Core City Area of Bhimeshwor Municipality, Dolakha
Detailed Engineering Survey, Design, Estimate and Report Preparation of Beni-Pakhapani-Malkawang Road (13.316 KM)
Detailed Engineering Survey, Design, Estimate and Report Preparation and Initial Environmental Examination of Itahar Bypass Road-Narahi-Sirsiya-Siswa-Lautan-Gaupalika Office Road Project. (8.923 KM)
Preparation of Detailed Engineering Survey, Design and Cost Estimate Sankranti Bazar – Khamlalung – Sandu – Bhandaridanda Road, Terhathum (Ch. 0+000 to 27+940 Km)
“Preparation of Detailed Engineering Survey, Design and Cost Estimate of Section I: Yasok Solmari Satimure Road Section Chainage(0+000) to (14+500)Km and Section II: Kabilale Hattipokhari Kaartike Simara Road Section Chainage(0+000) to (9+200)Km”
Detail Feasibility Study, Monitoring and Estimation Rehabilitation of Talki Khola Mirco Hydro Project,Dolpa
Detail Site Survey for Implementation of Solar Mini Grid Project and Preparing the Detail Feasibility Project Report-Cluster 1
1. Dho Taksi SMG (Dolpa) Shey Phoksundo RM 2.Ranma Malikot SMG ( East Rukum) Ranma RM