Detailed Engineering Survey, Design, Estimate and Report Preparation and Initial Environmental Examination of Itahar Bypass Road-Narahi-Sirsiya-Siswa-Lautan-Gaupalika Office Road Project. (8.923 KM)

Project Title

Detailed Engineering Survey, Design, Estimate and Report Preparation and Initial Environmental Examination of Itahar Bypass Road-Narahi-Sirsiya-Siswa-Lautan-Gaupalika Office Road Project. (8.923 KM)

Project Location

Karaimai Rural Municipality, Bara,

Project Client

Office of Rural Municipal Executive, Karaimai Rural Municipality, Bara, Madesh Province

Completion Date

2078.03.25
• Site Visit and Fixation of Alignment.
• Topographical Survey
• Hydrological Analysis and Geotechnical Study
• Design of Road, Cross Drainage and structures.
• Rate Analysis, Quantity Estimation and Cost Analysis.
• Tender Document Preparation.

key Achivements

• Site Visit and Fixation of Alignment.
• Topographical Survey
• Hydrological Analysis and Geotechnical Study
• Design of Road, Cross Drainage and structures.
• Rate Analysis, Quantity Estimation and Cost Analysis.
• Tender Document Preparation.