“Preparation of Detailed Engineering Survey, Design and Cost Estimate of Section I: Yasok Solmari Satimure Road Section Chainage(0+000) to (14+500)Km and Section II: Kabilale Hattipokhari Kaartike Simara Road Section Chainage(0+000) to (9+200)Km”
Project Title
“Preparation of Detailed Engineering Survey, Design and Cost Estimate of Section I: Yasok Solmari Satimure Road Section Chainage(0+000) to (14+500)Km and Section II: Kabilale Hattipokhari Kaartike Simara Road Section Chainage(0+000) to (9+200)Km”
Project Location
Panchthar, Koshi Province
Project Client
Infrastructure Development Office, Transport Infrastructure Directorate, Ministry of Physical Infrastructure Development, Province no 1
Completion Date
2079/03/03
• Site Visit and Fixation of Alignment.
• Topographical Survey
• Hydrological Analysis and Geotechnical Study
• Design of Road, Cross Drainage and structures.
• Rate Analysis, Quantity Estimation and Cost Analysis.
• Tender Document Preparation.
• Topographical Survey
• Hydrological Analysis and Geotechnical Study
• Design of Road, Cross Drainage and structures.
• Rate Analysis, Quantity Estimation and Cost Analysis.
• Tender Document Preparation.
key Achivements
• Site Visit and Fixation of Alignment.
• Topographical Survey
• Hydrological Analysis and Geotechnical Study
• Design of Road, Cross Drainage and structures.
• Rate Analysis, Quantity Estimation and Cost Analysis.
• Tender Document Preparation.
• Topographical Survey
• Hydrological Analysis and Geotechnical Study
• Design of Road, Cross Drainage and structures.
• Rate Analysis, Quantity Estimation and Cost Analysis.
• Tender Document Preparation.