Preparation of Detailed Project Report of River Bank Protection along Kulekhani River.
Project Title
Preparation of Detailed Project Report of River Bank Protection along Kulekhani River.
Project Location
Makawanpur
Project Client
Indrasorabar Rural Municipality
Completion Date
June 2021
Assessment of Community Involvement, Socio Economic Impact, use of local technology
before and after project implementation.
xix) Creation of Hydrological and meteorological parameters database
xx) Comparison of land use land cover pattern, river morphology, infrastructure development
(road, building, education, health, agriculture, other sectors etc.) trend before and after the
project implementation, impact (economic, social, cultural, health, education and other
sectors) assessment, investment pattern in the study area.
Study of Climate change, livelihood condition, change in economic status, migration trend
in the study area.
xxii) Study of Major flood event, impact on (water users, aquatic ecology, increased human
intervention, agricultural practices, loss of riparian habitats).
xxiii) Recommendation for the design parameters in River Management works.
xxiv) Propose appropriate plan/design/drawings which can form basis for actual river control
measures.
xxv) Preparation of rate analysis based on current approved rate and prepare cost estimate of the
proposed river training measures.
xxvi) Preparation of implementation program for proposed subproject.
before and after project implementation.
xix) Creation of Hydrological and meteorological parameters database
xx) Comparison of land use land cover pattern, river morphology, infrastructure development
(road, building, education, health, agriculture, other sectors etc.) trend before and after the
project implementation, impact (economic, social, cultural, health, education and other
sectors) assessment, investment pattern in the study area.
Study of Climate change, livelihood condition, change in economic status, migration trend
in the study area.
xxii) Study of Major flood event, impact on (water users, aquatic ecology, increased human
intervention, agricultural practices, loss of riparian habitats).
xxiii) Recommendation for the design parameters in River Management works.
xxiv) Propose appropriate plan/design/drawings which can form basis for actual river control
measures.
xxv) Preparation of rate analysis based on current approved rate and prepare cost estimate of the
proposed river training measures.
xxvi) Preparation of implementation program for proposed subproject.
key Achivements
Collect, compilation, computation and processing of hydro-meteorological, agricultural, social
and institutional data
• Assessment of crop water requirement and cropping pattern
• Details work and reports on social, economical and institutional aspect.
• Preparation of design and drawings.
• Estimations of economical appraisal.
and institutional data
• Assessment of crop water requirement and cropping pattern
• Details work and reports on social, economical and institutional aspect.
• Preparation of design and drawings.
• Estimations of economical appraisal.